The new Heineken Logistic Warehouse achieves LEED GOLD certification

LEED GOLD HEINEKEN SEVILLA1

The logistics platform is the main distribution centre for the products of the multinational brewery Cruzcampo in southern Spain.

Alcalá de Guadaíra, Seville: Zero Consulting has managed the LEED GOLD certification process for a Heineken distribution centre in Alcalá de Guadaíra (Seville). The warehouse was built in record time to begin its operations.

 

The entire construction phase lasted a little over nine months. A very short period considering that it is a warehouse with a surface area of 9081 m2, and following the protocol and the requirements of the sustainable certification of the LEED seal. The LEED GOLD Certification is awarded to buildings that perform excellence and leadership in energy use and environmental design.

Zero-consulting-certificación LEED GOLD-cruzcampo-

This certification confirms the validation, by the US Green Building Council, of the building's performance. Verifying the efficiency of water use, the use of alternative energies, limitation of construction waste, and, in general, the fulfilment of sustainability objectives that combine environmental, economic performance, and occupant comfort, as well as the conservation of the environment.

zero-consulting-leed-gold-cruzcampo2

The Heineken-Cruzcampo logistic warehouse stands out for the exceptional energy optimisation achieved, improvements in its location, and innovation, among others. Clearly, every year more companies recognize the double benefit of committing to excellence in energy use and environmental design, and the company HEINEKEN-CRUZCAMPO is one of them.

Achieving a LEED Gold certification is not only a commitment to the environment, it is also a coherent and visionary economic decision of the brand towards society.

ZERO-COMSULTING-HEINEKENSEVILLA

The platform is the main distribution centre for the multinational brewery's products in the south of our country. Although more than any specific measure, the good results of the project have been achieved thanks to the commitment of the entire team with the certification from the initial phase of the project.

 

 

New call-to-action